Washington County Hospital |
||||||
|
||||||
![]() |
||||||
CMSI was contracted as a design-builder to install a new Biplane EP cathethorization lab and upgrade the existing cathetorization lab. The project was completed without any impact to existing clinical operations or patient care.
Special methods were used to facilitate the installation of the overhead equipment due to limited ceiling heights. New mechanical and electrical infrastructure was required as well as additional medical gases to include WAG. A new UPS was installed and connected to the hospital emergency power system.
